D5.1 Requirements Framework n°1
D 5.1 is the first version of the Requirements Framework of the project. It includes all pilot blueprints and the related requirements for domain use cases. It also consolidates all requirements of domain use cases captured across the domains of the project and synthesizes them in a common Requirements Framework that is aligned with the WP6 Architectural Framework. The Requirements Framework includes a grouping of requirements per proposed e-SENS Building Block. This report, D5.1 - 0, is the first part of the deliverable that presents the consolidation of the requirements for the domain use cases of the project. The other parts of D5.1, ( D5.1 - 1 , D5.1 - 2, D5.1 - 3 and D5.1 - 4) include the pilot blueprint descriptions and the related requirements for the corresponding domains of the project.
Publish date: 30.04.14






D5.2 Pilot Lifecycle Management Methodology and Workflow Support Tools
D5.2 presents a framework covering the full process of identifying, selecting, preparing, planning, executing and evaluating the individual domain and national pilots across the entire e-SENS project. It presents the: - Principles and criteria for the qualification and selection of pilots, - Pilot lifecycle and the high-level view of the milestones and timeline of the e-SENS pilot projects, - e-SENS Pilot Lifecycle Management Methodology and Tools.
Filesize: 2.7 MB | Publish date: 31.05.14

D5.3 First-wave Pilot Scenarios and Plans n° 1
D5.3 includes the descriptions of the suggested domain use cases by all WP5.x domains and the piloting intentions and plans of all MS/AC intending to pilot in each of these domain use cases. The present document entitled D5.3-0 presents the overview of the entire D5.3, the approach and methodology followed, as well as the conclusions. The sub-deliverables D5.3-1, D5.3-2, D5.3-3, D5.3-4 should be referred to for the detailed descriptions of piloting use cases and national pilot plans within the four e-SENS domains of eProcurement, eHealth, e-Justice and Business Lifecycle respectively.
Publish date: 30.04.14





D5.4 Second-wave Update of Plans and Status of Domain and National Pilots
D5.4 includes the updated detailed pilot planning of the approved domain use cases by all WP5.x domains and the status of all domain and national pilots. The present document entitled D5.4-0 presents the overview of the entire D5.4, the approach and methodology followed, as well as the conclusions. The sub-deliverables D5.4-1, D5.4-2, D5.4-3, D5.4-4 should be referred to for the detailed descriptions and planning of the piloting domain use cases and the national pilot plans within the four e-SENS domains of eProcurement, eHealth, e-Justice and Business Lifecycle respectively.
Publish date: 11.05.15





D5.5 Third-wave Update of Plans and Status v1
Deliverable D5.5 includes the:
1. Detailed description of wave 3 national pilot plans on wave 1 use cases in the 4 original e-SENS domains, (eProcurement, eHealth, e-Justice and Business Lifecycle);
2. Detailed description of wave 3 domain and national pilot plans (new use cases approved on 27 March 2015) and
3. Readiness report on ABBs status for all domain and national pilots of e-SENS.
Filesize 6.2MB | Publish date: 5.06.16

D5.6 Pilot Evaluation, Handover and Long Term Sustainability
D5.6 Pilot Evaluation, Handover and Long Term Sustainability
Publish date: 03/2016
D5.7a Requirements Framework n°2
D5.7a is an interim version of D5.7 which is the second version of the Requirements Framework of the project. It updates deliverable D5.1 and includes a revision and update of requirements in pilot blueprints for domain use cases. It also consolidates all requirements of domain use cases captured across the domains of the project and synthesizes them in a common Requirements Framework that is aligned with the WP6 Architectural Framework. The updated Requirements Framework includes a grouping of requirements per proposed e-SENS Building Block. This report, (D5.7a-0), is the first part of the deliverable that presents the consolidation of the requirements for the domain use cases of the project. The other parts of D5.7a, (D5.7a-1, D5.7a-2, D5.7a-3 and D5.7a-4) include the updated pilot blueprint descriptions and the related requirements for the corresponding domains of the project.
Publish date: 11.06.15